Services
Turn-key solar, sized for how the building actually draws power.
We run two primary capability tracks — residential and industrial — with the same engineering rigor and the same 14-day commissioning standard on both. Commercial and agricultural sites are engineered along the same two tracks depending on scale.
Homes, apartments & private gates
Sized against your real appliance load — including air conditioning, usually the single biggest swing factor in a Pakistani household's bill — not a generic per-kW package.
- Rooftop and ground-mount structural design engineered for local wind loading
- Hybrid and on-grid inverter options, matched to backup needs
- Full protection: surge, earthing, DC/AC isolation to code
- Net-metering application handled for you — an included benefit for full-system clients, confirmed after survey
Typical residential scope
Typical industrial scope
Factories, warehouses & commercial units
Industrial sites run on three-phase loads, shift patterns and machinery start-up currents — our engineers model actual load curves before sizing anything.
- Three-phase system design with load-curve modelling
- Ground-mount and industrial shed-roof structural engineering
- Synchronisation with existing generators/UPS where applicable
- Net-metering integration for eligible full-system installations
What You're Really Buying
Hardware, software and expertise — not just panels.
A solar system is around 45+ individual components working together for a 25-year design life. Every one of them is specified and matched by our own engineering team.
Hardware
Market-leading components with direct manufacturer warranty, chosen for a 25-year design life and installed with full protection — nothing cut to save a few rupees.
Software
A free iOS and Android app for every client, showing real-time production and consumption alongside monthly and yearly history — no subscription fee.
Expertise
Engineers trained at Pakistan's leading universities run every design through strict quality-control protocols before a single panel is ordered.
Both tracks follow the same engineered process
01
Site Survey
02
Design & Sign-Off
03
Procurement
04
Installation
05
Grid Sync & Power-On
Not sure which track fits your site?
Start with your bill and AC count — we'll tell you where you land.